19PS.8
8. Srah Srang
The ICC recommends that the APSARA National Authority:
1. Prepares a detailed description of the strengthening of the pier;
2. Provides a calendar of implementation as well as estimation of the cost of the works;
3. Follows the adopted practice in Angkor Wat for the resetting of the steps by putting a geo-textile in order to isolate each stratum of sand that has been stabilized before replacing the stone blocks.