19PS.8

 

Sorry, this entry is only available in English and Français. For the sake of viewer convenience, the content is shown below in this site default language. You may click one of the links to switch the site language to another available language.

8. Srah Srang

The ICC recommends that the APSARA National Authority:
1. Prepares a detailed description of the strengthening of the pier;
2. Provides a calendar of implementation as well as estimation of the cost of the works;
3. Follows the adopted practice in Angkor Wat for the resetting of the steps by putting a geo-textile in order to isolate each stratum of sand that has been stabilized before replacing the stone blocks.