22TS.8 20PS

 

Sorry, this entry is only available in English and Français. For the sake of viewer convenience, the content is shown below in this site default language. You may click one of the links to switch the site language to another available language.

Western embankment of Angkor Wat moat (IGeS):

a. Adjust and align the upper part of the steps by replacing, where necessary, the unusable sandstone blocks and by consolidating those that are only partially damaged;

b. Adjust the position and size of the geotextile layer after dismantling of all blocks and replacing the unusable laterite blocks;

c. See to restoration of the visual aspect of the rows of steps between the Italian team work site now underway and APSARA’s work site that will commence shortly;

d. Take into consideration the difference in structure and profile with regard to what may originally have been wooden bridges.