33TS.2 26PS

 

Sorry, this entry is only available in English and Français. For the sake of viewer convenience, the content is shown below in this site default language. You may click one of the links to switch the site language to another available language.

2. TERRACE OF THE ELEPHANTS:

a) The experts expressed their satisfaction with what has recently been done but reiterated that it is now urgent to follow up on the recommend-ations made at the 32nd Technical Session of the ICC and called for work to get started as quickly as possible.
b) To integrate the recommendations number 32.4 of the 32nd Technical Session from June 2019.
c) It is recommended that no tourist traffic be allowed while work is being done on the Terrace of the Elephants. A sign should be put up explaining the measure.