9PS.5

 

Sorry, this entry is only available in English and Français. For the sake of viewer convenience, the content is shown below in this site default language. You may click one of the links to switch the site language to another available language.

5. Carry on the work being done to develop the stung, including anti-pollution measures, treatment of the riverbanks and the creation of walkways or trails along the river.