11TS.2

 

Sorry, this entry is only available in English and Français. For the sake of viewer convenience, the content is shown below in this site default language. You may click one of the links to switch the site language to another available language.

2. APSARA maintenance units

Following the report by ROS Borath and his teams, Mr. MOUTON suggests this type of studies be extended to other sites. He recommends that those conducting such studies install their equipments as far away as possible from the structures, or at the very least at a reasonable distance from them, even slightly further away than strictly necessary.